Change Language :
Several E4.1 series energy chains were installed to guide the cables to the pipe laying tower and the tensioner on a pipe-laying vessel. They move the numerous cables safely and are comparatively light. And designed as pre-assembled readychain® energy chain systems, the operator saved installation time and costs.

Office hours
Monday to Friday from 8 am - 8 pm.
Live chat:
24h